[Hazardous Waste Resource Utilization] Industrial Validation Project for Dust Removal and Arsenic Removal from High-Temperature Flue Gas in Antimony Smelting in Yunnan, and Hazardous Waste Resource Utilization
+
  • [Hazardous Waste Resource Utilization] Industrial Validation Project for Dust Removal and Arsenic Removal from High-Temperature Flue Gas in Antimony Smelting in Yunnan, and Hazardous Waste Resource Utilization

[Hazardous Waste Resource Utilization] Industrial Validation Project for Dust Removal and Arsenic Removal from High-Temperature Flue Gas in Antimony Smelting in Yunnan, and Hazardous Waste Resource Utilization


If you need customized products,  Contact US !

Tag list: [Hazardous Waste Resource Utilization] Industrial Validation Project for Dust Removal and Arsenic Removal from High-Temperature Flue Gas in Antimony Smelting in Yunnan, and Hazardous Waste Resource Utilization

Project Details

INTERMET

 

Industrial Validation Project for Dust Removal and Arsenic Removal from High-Temperature Flue Gas in Antimony Smelting in Yunnan, and for the Resource Recovery of Hazardous Waste

 

 

Main technical parameters:

 

  • Process medium: High-temperature flue gas from the anode slime reverberatory furnace
  • Gas handling capacity: 4,000 m³/h
  • Operating temperature: 450°C
  • Emission standard: dust concentration ≤ 10 mg/Nm³
  • Antimony-containing dust from antimony recovery 2 O 3 >90%
  • Recovery of As from arsenic fumes and dust 2 O 3 >98%

 

Quick Quote

Skip the queue! Get tailored solutions within 24h

Share to

Request Quote

Let us know your requirement. We will connect best products with you.

SUBMIT